by EGI | Feb 12, 2024 | External Links, Publications, Utah FORGE
Abstract: Circulation tests were conducted to test the connectivity between the injection well 16A(78)-32 and the production well 16B(78)-32 in July 2023 at Utah FORGE site. The test results show that there is a connection between these two wells. Around 7750 bbl of...
by EGI | Feb 6, 2023 | External Links, Publications, Utah FORGE
Abstract: In April 2022, three stages of stimulation were carried out near the toe of well 16A(78)-32. During the field stimulations, pumping pressure, pumping rate, and microseismic events were recorded. Previously, before the actual field stimulations, predictions...